| Location: | High Street, Cowbridge |
| Work Description: | 2/way temporary stop & go to be conducted by Corehighways to allow Welsh Water to carry out a new connection in the footway safely, to be carried out with same day reinstatement |
| Traffic Management Company: | Corehighways |
| Traffic Management Configuration: | 2 Way Temporary Stop & Go |
| Client: | Welsh Water |
| Approval for this application is granted subject to the following. | |
| Dates of operation: | |
| – Date from: | 13/08/2026 |
| – Times: | 18:00 – 00:00 |
| – Date to: | 13/08/2026 |
| – Traffic management to be installed and removed at specified times | |
| – TM attached to email | |
| – Access must be maintained to residents and businesses at all times | |
| Application is approved in principle, amendments to TM are to be made if needed thereafter. | |
| Information boards to be provided. | |
| All necessary road works signing are to be in place in accordance with chapter 8 of the traffic signs manual including signs in any side roads. | |
| Emergency Contact Number | 0330 043 3030 |
| Reference No. | 1974 |