Road Closure

Location: High Street, Cowbridge
Work Description: 2/way temporary stop & go to be conducted by Corehighways to allow Welsh Water to carry out a new connection in the footway safely, to be carried out with same day reinstatement
Traffic Management Company: Corehighways
Traffic Management Configuration: 2 Way Temporary Stop & Go
Client: Welsh Water
Approval for this application is granted subject to the following.
Dates of operation:
– Date from: 13/08/2026
– Times: 18:00 – 00:00
– Date to: 13/08/2026
– Traffic management to be installed and removed at specified times
– TM attached to email
– Access must be maintained to residents and businesses at all times
Application is approved in principle, amendments to TM are to be made if needed thereafter.
Information boards to be provided.
All necessary road works signing are to be in place in accordance with chapter 8 of the traffic signs manual including signs in any side roads.
Emergency Contact Number 0330 043 3030
Reference No. 1974